In AI, the hard limit isn’t always GPUs — it’s power.
The next compute market won’t be “who has the most chips,” but “who can deliver stable workloads under real constraints”: electricity price, availability, cooling, and grid limits.
That’s why compute + energy + operations should be treated as one RWA package — not as a single headline number.